Symmetry Park, Biggleswade

Symmetry Park, Biggleswade extends to a total of 95 acres. Phase 1 consists of a pre-let to The Co-operative Group Limited for a new 661,000 sq ft Regional Distribution Centre (“RDC”) over 50 acres which becomes operational in mid-2021.

Phase 2, extending to 45 acres, is now under construction consisting of 3 speculatively developed buildings of 75,000 sq ft, 160,000 sq ft and 230,000 sq ft with completion for occupation due Sept 2022. Unit 05 is already pre-committed to Bond International.

Further phases are available through separate discussion.

Location

Situated on the established Stratton Business Park, the site provides excellent road links to the national motorway network. Symmetry Park, Biggleswade is situated approximately 600m from the A1 providing fast access to the M25. The M25 (J23) is only 29 miles to the South, M1 (J13) 22 miles to the West and the A14 is only 22 miles North.

Postcode: SG18 8YY

Specification

Warehouse & external areas

  • All new units to be built to net zero carbon in construction
  • Buildings designed to achieve BREEAM rating ‘Very Good’
  • Target EPC A rating
  • Electric vehicle charging points
  • PV solar power generation
  • LED lighting throughout
  • High quality external elevation materials
  • Sustainable Urban Drainage Systems
  • 80kN/m2 floor loading
  • Secure yard with gatehouse
  • Ability to install sprinkler tank

Accommodation Schedule

Unit 02
sq ft sq m
Warehouse 150,000 sq ft 13,935 sq m
Offices 10,000 sq ft 929 sq m
Total 160,000 14,864
Unit 03
sq ft sq m
Warehouse 70,000 sq ft 6,503 sq m
Offices 5,000 sq ft 465 sq m
Total 75,000 6,968
Unit 04
sq ft sq m
Warehouse 218,000 sq ft 20,253 sq m
Offices 12,000 sq ft 1,115 sq m
Total 230,000 21,368
Unit 05
Pre-committed to Bond International
sq ft sq m
Total 112,000 10,405

Contacts

James Haestier
james.haestier@colliers.com

+44 (0)7818 038009

Tim Harding
tim.harding@colliers.com

+44 (0)7860 180328

Richard Last
richard.last@brownandlee.com

+44 (0)7921 166595