COVID-19: We have now re-opened our Northampton and Manchester offices. Read more.

Extending to a total of 70 acres, Central M40 has detailed planning consent for a total of 1,051,209 sq ft of industrial warehouse accommodation. Situated directly alongside the M40 at Junction 11, the site provides prominence for occupiers and excellent transport links to the national motorway network.

Phase 1 is complete comprising construction of a 236,580 sq ft building let to Hellofresh and a bespoke 114,000 sq ft headquarters for Prodrive Motorsport.

Phase 2 is complete with Unit 7 (95,002 sq ft) let to TVS Supply Chain Solutions and Unit 8 (78,117 sq ft) let to Rinkit.

Phase 3 comprising Unit 5 (334,760 sq ft) is now let to Great Bear Distribution.  Unit 6 (198,750 sq ft) is under construction and available for occupation Q3 2021.

Phase 4 comprising Unit 9 (83,750 sq ft) which has been pre-let to Warburtons, and Unit 10 (144,800 sq ft) is under construction and available for occupation Q3 2021.

We have made a significant commitment to the environment to deliver all new buildings to net zero carbon in construction. More information can be found here.

Further Information

Location

Central M40 provides fast access to the M40 (within 1 mile) and lies between Birmingham (44 miles) and London (78 miles), providing ideal links with the East Midlands, West Midlands and London / South East markets. Central M40 has 75% of the UK population within 4 hours HGV drive time.

Low Carbon Agenda

Unit 6 and Unit 10 will be built to net zero carbon in construction. Tritax Symmetry have aligned their commitment to the UK Green Building Council (UKGBC) Advancing Net Zero campaign and have launched the Tritax Symmetry Net Zero is Here initiative here.

Specification

Warehouse

  • Twin service yards
  • 50kN/m2 floor loading
  • 15m clear internal height
  • PV solar power generation
  • HGV parking
  • Dock leveller doors
  • Level loading doors

Office

  • Grade A office specification
  • Double height atrium reception
  • PIR controlled energy efficient lighting
  • Heavy duty raised access floor
  • Metal pan ceiling tiles
  • Kitchenette

Phase 1 Complete

Unit: 3: 236,580 sq ft; let to HelloFresh
Unit: 4: 114,226 sq ft; bespoke headquarters for Prodrive Motorsport

Phase 2 Complete

Unit 7: 95,002 sq ft; let to TVS Supply Chain Solutions
Unit 8: 78,117 sq ft; let to Rinkit

Phase 3 Under construction

Unit 5: 334,760 sq ft; let to Great Bear Distribution
Unit 6: 198,750 sq ft; under construction and available Q3 2021.

Phase 4 Under construction

Unit 9: 83,750 sq ft; pre-let to Warburtons
Unit 10: 144,800 sq ft; under construction and available Q3 2021.

Accommodation Schedule

Unit sq ft sq m
3 Hellofresh 236,580 21,979
4 Prodrive Motorsport 114,226 10,591
5 Great Bear Distribution 334,760 31,100
6 Under construction 198,750 18,464
7 TVS SCS 95,002 8,826
8 Rinkit 78,117 7,257
9 Pre-let to Warburtons 83,750 7,780
10 Under construction 144,800 13,452

Contacts